Author
Marco Torri
Founder and Editor · EE&HL Network
Marco Torri founded EE&HL Network and edits its case studies, insights and weekly newsletter on the commercial side of structural erection engineering and heavy lift: the decisions, construction sequences and contract patterns behind bridges, major structures and complex installation projects.
Profile

Marco Torri
Founder and Editor, EE&HL Network
EE&HL Network was founded by Marco Torri, who spent 15 years at the contractor–client interface in erection engineering and heavy lift.
Before founding EE&HL Network, Marco spent 15 years in international sales and business development across the erection engineering and heavy lift sector — starting in international sales for the lifting and transport industry, moving through regional sales and branch leadership roles across multiple international markets, including leading a branch office through a major LNG infrastructure build, then into business development for engineering contractors, and finally into strategic sales leadership for erection engineering and heavy lift technology providers in the UK. That path crossed bridge launching, strand jacking, skidding, specialist lifting, and modular construction technology — always from the commercial side of the table.
Marco studied at the Università degli Studi di Milano (University of Milan) and works in English, Italian, Spanish and French.
Reach
Join the conversation:
Editorial role
Writing from the contractor–client interface.
Marco has spent 15 years at the contractor–client interface, where decision timing, sequencing risk, contract positioning and the consequences of engineering choices are worked out, often well beyond what the method statement records. EE&HL Network documents that layer.
Its pages are written in an observer’s voice: they record what published sources say about a project and label any interpretation as an editorial reading. Figures are attributed to their sources, and competing figures are disclosed.
The standards behind that work are set out in the editorial methodology. For more on the platform, see About EE&HL Network.
Selected writing
Recent work on eehl.net
- The bid that was a methodNewsletter Issue 16 · New NY Bridge and design-build pricing
- The Dam That Had to Be Built ColdCase study · Hoover Dam, 1931–1936
- A Concrete Arch That Was Not Yet an ArchCase study · Krk Bridge, 1976–1980
- The Record Cantilever That Kept DeflectingCase study · Koror–Babeldaob Bridge, 1977–1996
- Why the Transition Can Be Riskier Than the LiftInsight · load transfer
- When Temporary Works Stay in Place Too LongInsight · temporary works
- Four installation sequences, one jack-upNewsletter Issue 15 · Saint-Nazaire offshore wind farm
- Weather Windows: Why Wind Doesn’t Delay Heavy Lifts the Way People ThinkInsight · weather windows
- 78 Temporary Supports Under a 14,000-Tonne RoofCase study · Beijing National Stadium, 2003–2008
- 55 km of Viaduct Above a Highway That Never ClosedCase study · Bang Na Expressway, Bangkok, 1995–2000
- What Is Erection Engineering?Knowledge page
All work: case studies · insights · newsletter archive.